History of Power
Great Milestones of Electricity Supply in Sri Lanka
| 1981 |
| Bowatenna PS 40 MW. Kelanitissa Gas Tubine PS 120 MW. |
|
| 1983 |
|
| 1984 |
| Sapugaskanda Dissel PS 80 MW commissioned. |
|
| 1985 |
| Victoria PS(Stage 2) 70MW. Kotmale (Stage1) 67 MW. |
|
| 1986 |
| Kotmale PS (Stage 2) 67 MW x2, Nilambe PS 3.2 MW. |
|
| 1988 |
| Ranganigala PS (Stage 2) 67 MW x2, Nilambe PS 3.2 MW. |
|
| 1989 |
| K.K.S Cement Factory Power Station 8.2 MW |
|
| 1992 |
| Samanalawewa Hydro Electricity Power Project 60 MW x 2 |
|
| 1997 |
| Kelanitissa Gas Turbines 115 MW, Sapugaskanda Diesel PS 10MW x 4, Lakdhanavi (Pvt) Ltd. 16.8 MW. |
|
| 1998 |
| Sapugaskanda Diesel Ext. PS 10MW x 4 commissioned. |
|
| 2000 |
| Colombo Power(Pvt) Ltd 64 MW commissioned. |
|
| 2002 |
| Ace Power Matara and Horana 20MW each commissioned. |
|
| 2003 |
| AES Kelanitissa Combined Cycle Power Porject 163 MW |
|
| 2005 |
| Construction of the Upper Kotmale Hydro Power Station started. |
|
| 2006 |
| Construction of the Puttalum Coral Power Plant started. |
|
| 2007 |
| Construction of the Kerawalapitiya Combined Cycle started. |
|
|